Defect Liability Period (DLP) in Contracts: FIDIC Reference

- Advertisement -
- Advertisement -
- Advertisement -
- Advertisement -

The Defect Liability Period (DLP) is a crucial element in construction and infrastructure contracts that ensures the quality and durability of work performed by contractors. It serves as a safeguard for project owners by holding the contractor responsible for any construction defects that arise after completion and handover. This article explores the concept of DLP, its legal and contractual significance, and how it is addressed in FIDIC (International Federation of Consulting Engineers) contracts.


The Defect Liability Period, also known as the maintenance period, is a specified time frame after the completion of a construction project during which the contractor is legally obliged to rectify any defects or issues that arise due to poor workmanship, design, or materials.

Typically, DLP ranges from 12 to 24 months depending on the contract and nature of the project. During this time, the client withholds a portion of the final payment (retention money) to ensure the contractor fulfills their defect correction obligations.


  1. Commencement: DLP usually begins from the date of project completion or Taking Over Certificate (TOC) issuance.
  2. Duration: Commonly ranges from 12 to 24 months, but can be adjusted based on contract terms.
  3. Scope: Covers defects due to workmanship, material failures, or design faults.
  4. Obligation: Contractor must fix defects at their own cost.
  5. Retention Money: A portion of payment (typically 5-10%) is withheld until the DLP expires.
  6. Final Certificate: Issued only after the DLP ends and all defects are satisfactorily repaired.

The DLP is a critical phase in project delivery for the following reasons:

1. Quality Assurance

It incentivizes the contractor to deliver high-quality work and discourages shortcuts during construction, knowing that any defects will need to be repaired later at their own cost.

2. Risk Mitigation

The client is protected from the financial and operational risks associated with latent defects that might appear after project handover.

3. Maintenance Responsibility

The contractor, not the client, remains responsible for repairs and corrections during the DLP, reducing maintenance costs for the owner during that period.

4. Performance Evaluation

The DLP acts as a real-world performance test for the structure or system, allowing issues to surface and be addressed before final acceptance.


FIDIC contracts are globally recognized standard forms of contract used in the construction and engineering industry. They provide detailed clauses about the Defects Notification Period (DNP), which corresponds to the DLP in general contract terminology.

📘 FIDIC Red Book (1999 Edition) – Clause 11: Defects Liability

The Red Book is widely used for building and engineering works designed by the employer.

Key Provisions:

  • Clause 11.1: Specifies the contractor’s obligation to remedy defects that appear during the Defects Notification Period, typically 12 months after the date of completion.
  • Clause 11.2: States that the employer shall notify the contractor of any defects before the end of the DNP.
  • Clause 11.3: Outlines the process for rectifying defects. The contractor must repair defects promptly after notification.
  • Clause 11.4: Allows the employer to carry out the work if the contractor fails to act, and recover the cost.
  • Clause 11.5: Final Completion Certificate is issued only after the contractor has rectified all notified defects.

🔍 Comparison with DLP

  • FIDIC uses the term Defects Notification Period (DNP) instead of DLP.
  • The contractor remains responsible for correcting defects notified during the DNP.
  • Retention money is often linked to performance during this period.

In most custom or government contracts, the DLP clauses are designed along similar lines as FIDIC:

  • Trigger Event: Issuance of Taking Over Certificate.
  • Contractor Obligation: Fixing defects free of cost.
  • Inspection Protocol: Periodic inspections during DLP.
  • Penalty Clause: If contractor fails to rectify, the client may get it done and deduct costs.

🛠️ Access to Site

Post-handover, site access may become restricted, making repairs logistically challenging. Contracts should include clear provisions for site access during DLP.

⏳ Delayed Defect Reporting

Clients must report defects promptly. Any delay may affect the contractor’s liability or ability to repair.

📄 Record Keeping

Both parties should maintain detailed records of inspections, defects, and correspondence to avoid disputes.

⚖️ Dispute Resolution

If disputes arise regarding whether an issue is a “defect” or due to misuse, contractual and technical clarity is essential.


  1. Clear Documentation: Define DLP duration and scope precisely in the contract.
  2. Timely Notifications: Use formal channels for defect reporting.
  3. Periodic Inspections: Schedule inspections before DLP ends.
  4. Retention Management: Release retention money only after all defects are rectified.
  5. Include Warranties: Complement DLP with product or system warranties for added protection.

The Defect Liability Period is a vital mechanism to ensure long-term quality in construction projects. It legally binds contractors to correct any defects post-handover, offering a layer of protection and assurance to the project owner.

FIDIC contracts, with their globally accepted structure, provide a comprehensive and balanced approach to managing this period through the Defects Notification Period clause.

Whether you’re a contractor, consultant, or client, understanding the legal and practical implications of DLP can significantly enhance project success and reduce post-completion disputes.

Also read: Contract Lifecycle and its Management

- Advertisement -
Rajesh Pant
Rajesh Panthttps://managemententhusiast.com
My name is Rajesh Pant. I am M. Tech. (Civil Engineering) and M. B. A. (Infrastructure Management). I have gained knowledge of contract management, procurement & project management while I handled various infrastructure projects as Executive Engineer/ Procurement & Contract Management Expert in Govt. Sector. I also have exposure of handling projects financed by multi-lateral organizations like the World Bank Projects. During my MBA studies I developed interest in management concepts.